Orphaned calculations
Orphaned calculations are calculations that are not leveraged across the model. These are calculations that are not used by:
Data Stores
Presenter Report
Downstream Calculations
Web Forms
Views
Recommendations for handling orphaned calculations
Orphaned calculations add to the total computation time and should be removed if there are no plans to utilize them.
If you have locked the model and there is no need to have the calculation generating results for the open period, it is recommended to end date the Time partition.